Customization: | Available |
---|---|
Feature: | Durable, Easy to Install, Fierproof, Flame Retardant, Heat Insulation, Noise Reduction, Waterproof |
Highest Working Temperature: | 600℃ |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Rockwool mattress takes basalt as the main raw material, with good non-flammability and melting point above 1000ºC, Liluan rockwool products are particularly effective in heat insulation and fire prevention, reducing or absorbing noise. It is suitable for heat preservation, heat insulation, sound absorption and noise reduction of large pipelines, containers, storage tanks, boilers and transmission pipelines. One side of the rock wool mattress with reinforced metal-wire mesh (mesh hole 1 inch),can ensure that the rock wool will not have any tear and damage.
Specifications:
1. Size: Normal 3*0.6m, support customization.
2. Thickness: 30-150mm
3. Density: 40-120 kg /m3
Product model |
Manufacturer
standard
|
National
standard
|
USA
standard
|
||
Thermal conductivity(25ºC) | 0.039 | ≤0.044 | ≤0.042 | ||
Combustion performance | Class A | Class A | Class A | ||
Shot content %
|
4.0 | ≤6 | 4% | ||
Hydrophobic rate | ≥99 % | 98% | 98% | ||
Organic content | 1.3 | ≤1.5 | --- | ||
Density tolerance | ±5% | ±10% | ±10% | ||
Cl-Concentration ppm
|
≤10ppm | --- | ≤10ppm |
Detailed Images:
Packaging & Shipping:
FAQ:
Q: Are you a manufacturer or a trading company ?
A: We are a manufacturer founded in 2009, annual production capacity of 50,000 tons.
Q: Can you accept neutral packing & OEM ?
A: Normally, our packing is vacuum bag with "DongWuTianZi" logo , but we can accept the neutral packing and OEM. However, custom should pay the OEM packing charge.
Q: Can you provide the sample for free ?
A: We provide some samples for free, but the express charge should be bore by customer.
Q: What's the lead time?
A: 7-15 days after receipt of advanced payment
Q: What's the payment term?
A: 30% advanced payment and 70% paid prior to load by TT.