|
Still deciding? Get samples of $ !
Request Sample
|
| Customization: | Available |
|---|---|
| Feature: | Durable, Easy to Install, Fierproof, Flame Retardant, Heat Insulation, Noise Reduction, Waterproof |
| Highest Working Temperature: | 600℃ |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Product model | LL-HL-80 | LL-HL-100 | LL-HL-120 | Unit | Standard |
| Compressive strength | ≥40 | ≥60 | ≥80 | KPa | GB/T13480 |
| Tensile strength | ≥100 | ≥150 | ≥200 | kPa | GB/T30804 |
| The average diameter of fibers | ≤5 | μm | GB/T5480 | ||
| Shot content | ≤4 | % | GB/T5480 | ||
| Thermal conductivity(25ºC) | ≤0.043 | W/(m·k) | GB/T30802 | ||
| Combustion performance | Class A | --- | GB8624-2012 | ||
| Acidity coefficient | ≥1.8 | --- | GB/T 5480 | ||
| Hydrophobic rate | ≥99 % | % | GB/T 10299 | ||
| Mass moisture absorption rate | ≤1.0 | % | GB/T 5480 | ||
| Water absorption(Partial Immersion) Short term(24h) | ≤0.5 | kg/m2 | GB/T 30805 | ||
| Noise reduction coefficient (NRC) | ≥0.6 | --- | GB/T18696.1 | ||
| Dimensional stability | ≤1.0 % | % | GB/T 30806 | ||
| Melting temperature | ≥1000 | ºC | --- | ||
| Thickness tolerance | ±1 | mm | GB/T5480 | ||
| Planeness tolerance | ≤2 | mm | GB/T25975-2018 | ||
| Product model | LL-HW-80 | LL-HW-100 | LL-HW-120 |
| Density,KG/m³ | ≥80 | ≥100 | ≥120 |
| Length, mm | 1200-2400 | ||
| Width, mm | 30-150 | ||
| Thickness, mm | 30~150 | ||







Q: Are you a manufacturer or a trading company ?
A: We are a manufacturer founded in 2009, annual production capacity of 50,000 tons.
Q: Can you accept neutral packing & OEM ?
A: Normally, our packing is vacuum bag with "DongWuTianZi" logo , but we can accept the neutral packing and OEM. However, custom should pay the OEM packing charge.
Q: Can you provide the sample for free ?
A: We provide some samples for free, but the express charge should be bore by customer.
Q: What's the lead time?
A: 7-15 days after receipt of advanced payment
Q: What's the payment term?
A: 30% advanced payment and 70% paid prior to load by TT.