Customization: | Available |
---|---|
Feature: | Durable, Easy to Install, Fierproof, Flame Retardant, Heat Insulation, Noise Reduction, Waterproof |
Highest Working Temperature: | 600℃ |
Still deciding? Get samples of US$ 0/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Performance | Enterprise Standard | National Standards | ASTM Standard |
Shot content ( Particle diameter ≥0.25mm)% | 4 | ≤7 | 4 |
The average diameter of fibers μm | 4.2 | <6 | <7 |
Thermal conductivity W/(m·k) Average temperature70ºC | ≤0.039 | ≤0.044 | ≤0.042 |
Organic content % | 2.9 | ≤4.0 | --- |
Hydrophobic rate% | 99 | ≥98 | ≥98 |
Combustion performance | Grade A | Grade A | Grade A |
Chlorine ion content ppm | ≤10 | --- | ≤25 |
Heat load shrinkage temperatureºC | 700 | ≥600 | ≥650 |
Density tolerance % | ±5 | ±10 | ±10 |
Thickness(mm) | Length(mm) | Density(kg/m³) | Diameter(mm) |
30~100 | 1m/PC | 100-150 | φ22-810 |
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of "quality first, customer first and credit-based" since the establishment of the company and always do our best to satisfy potential needs of our customers. Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with anirresistible force.
Q: Are you a manufacturer or a trading company ?
A: We are a manufacturer founded in 2009, annual production capacity of 50,000 tons.
Q: Can you accept neutral packing & OEM ?
A: Normally, our packing is vacuum bag with "DongWuTianZi" logo , but we can accept the neutral packing and OEM. However, custom should pay the OEM packing charge.
Q: Can you provide the sample for free ?
A: We provide some samples for free, but the express charge should be bore by customer.
Q: What's the lead time?
A: 7-15 days after receipt of advanced payment
Q: What's the payment term?
A: 30% advanced payment and 70% paid prior to load by TT.